York AECB Level 2 deep retrofit

8 Petersway, York, YO30 6AR
Saturday 28th November 2026
Tour of an occupied AECB Certified Level 2 1930's brickbuilt home in York. 

An opportunity to hear from Paula the home owner about her honest experiences of her retrofitted home and from Phil Bixby the Architect, including how to manage overheating risks. 

The retrofit uses an IWI insulation strategy and achieved an airtightness test achieving Passivhaus standards using ProClima airtightness membranes and application of Aeroseal https://aeroseal.co.uk/ 
- Floor and roofs insulated to 0.16W/m2K
-  GBS tripled glazed windows from 21 Degrees and encapsulation of stained glass 
- Zehnder MVHR system from 21 Degrees
- 6kWp solar PV and 10kWh SunSynk battery 
- PV hot water diverter
- Mitsubishi Air Source Heat Pump

The contractor was Vine House Construction who have completed a number of retrofit and Passivhaus projects in and around York. 

About Phil Bixby
Phil runs York design practice Constructive Individuals. He’s an Architect and Passivhaus Designer and has completed a number of Certified Passivhaus projects in York and elsewhere along with many retrofit/alteration/extension projects in the region. This was his first AECB Standard retrofit project – with Eric Fewster as the certifier – and a learning process for all involved. 

About Paula Horton
Paula is the very well informed client on this ambitious retrofit. Professionally she has worked in social housing for many years and is currently Asset Programme Analyst at Joseph Rowntree Housing Trust in York.

Getting there
Petersway is a 25 minute walk from York Train station
Parking is limited so suggest using Rawcliffe Park and Ride bus service, get off at Clifton Green then a 2 minute walk. 
Alternatively street parking is on Compton Street and side streets off it .
6 tickets available
Price

Ticket price
£0.00